Success History
Oil and Gas
CLIENT: PARLYM INTERNATIONAL
PROJECT: UNITEX LPG PROJECT, SITAKUNDA, BARABKUNDA, CHITTAGONG, BANGLADESH.
We are currently handling end-to-end transportation services for PARLYM International for their client Unitex at Chittagong, Bangladesh.
We have delivered 40 pieces of Break Bulk cargo with two Containers in the first consignment, and another seven such shipments are scheduled to arrive by this year, which makes the total freight volume of the whole project around 10,000 CBM and maximum weight for each cargo will be around 22 metric tons.
The last phase of the delivery of containers is in progress, which consists of 100 containers.
Power & Energy
CLIENT: AFCONS INFRASTRUCTURE LIMITED
PROJECT: RAMPAL MAIN JETTY CONSTRUCTION PROJECT. MONGLA, KHULNA, BANGLADESH
FS Logistics is the transport and logistics support partner of Afcons Infrastructure, who are involved in construction of Bangladesh’s largest jetty construction project at the Rampal Power Plant Project.
We have, in coordination with Bolloré Bangladesh and Bolloré India, already co-handled 300 road loads and consignments among a total of 380 for the whole project duration up to mid-2019, which represents a total cargo amount of 5,000 freight tons.
Our specific expertise is key to the project, as cargo has to be transloaded at the Benapole border point from Indian trailers to Bangladeshi ones, while import customs processes are completed.
Logistics has allocated dedicated resources to the project at both the Benapole border and at
The project site for the best operations coordination and monitoring.
Ninety percent of the shipment is being imported on a re-exportable basis, which means after the project is completed, will be sending back the equipment again to its point of origin
Infrastructure
CLIENTS: JFE ENGINEERING CORP. (PARTNER OF OSJI JOINT VENTURE)
PROJECT: KMG 2ND BRIDGE CONSTRUCTION & EXISTING BRIDGE REHABILITATION
The cargo to be transported for this project was steel bridge construction materials and equipment.
Logistics, Bolloré Bangladesh & Bolloré Japan have so far co-handled the transportation of 10,000 metric tons of Break Bulk cargo and 200 Containers for the purposes of this project.
- Modes of transportation: Sea and Air
- Project Value: USD 30 Million
- Logistics’ scope of involvement in this project is:
- Reception of cargo at the destination port
- Customs clearance
- Transportation of cargo to the project site
Infrastructure
CLIENTS: TIONG WOON CRANE AND EQUIPMENT PTE LTD
PROJECT: KMG 2ND BRIDGE CONSTRUCTION & EXISTING BRIDGE REHABILITATION
As a part of KMG project, Logistics was responsible for the customs clearance and transportation of Tiong Woon Crane and Equipment PTE Ltd.
- No of containers: 11
- Total freight tons: 170.136
- Number of Cranes: 2 (1 Mobile Crane of 40MT and another 300MT capacity Crawler crane.